I applied through a recruiter. The process took 2 months. I interviewed at ADP (Toronto, ON) in Dec 2022
Interview
There were 4 rounds of interview for this role. 2 technical and 2 managerial rounds. The interview was done by architect, Automation engineer, Team Lead and the Director. The process was slow because of the holidays, and almost took 2 months to complete the interview process